Design, production, installation and commissioning of a 1,011 kWel cogeneration system powered by methane gas to simultaneously supply electrical and thermal energy to a hospital facility.
The cogenerator is equipped with a 70dB(A) @ 7 meter soundproof cabin, heat recovery system, oxidation catalyst for reducing CO2 emissions and remote supervision system.
The supply includes installation, technical supervision of assembly, start-up and test run of the cogeneration plant.

