Design, production, installation and commissioning of 2 Cogeneration Systems for two civil and industrial wastewater treatment plants.
- Installation, technical supervision of assembly, start-up and test run of 2 Cogeneration Units of 375 kWE each, powered by methane gas and biogas, including dehumidification system, ATEX blowers and double gas ramp.
- Technical supervision of assembly, start-up and test run of 2 Cogeneration Groups of 851 kWE each, powered by biogas and natural gas, including double gas/biogas ramp and LV/MV electrical transformation cabin (400V/6kV).